RXR Workplace Pre-Builds
A workplace strategy and design that responds to a changing world in response to Covid. The design provides the ability to readily modify suites based on future tenants’ space requirements. Each floor is given the flexibility to accommodate a range of tenant types. Each suite has a wall system that seamlessly integrates with the interior design and lighting and can be removed and interchanged with wall types.
RealEstate Planning and Commercial Renovation
75 Rockefeller Plaza New York, NY
42,000 sq ft [ 3 Floors @ 14,000 RSF Each ]
Gensler Team Members
Design Director: John Mulling
Manager: Andrew Stern
Project Designer: Katherine Kania
Project Job Captain: Alex Diaz








